Firing day 3

Day three went smoothly as well. I’ll give more details tomorrow, it’s been a long day… Here’s the short version

*spent the day fighting to get the back temp up. Fairly standard for day three. Front was in the 2300s, but the back was back to the 2100s.

*Teabowls were pulled from the front of the kiln in a sort of high temperature raku. Lots of folks came to watch.

*used a lot of wood. We got another cord delivered, and have used about half of the sidestoking wood split so far

*Got to see two of those noisy barred owls fly right past me. Awesome.

Firing, Day 2

The firing is going along smoothly. Yesterday evening, we had a bunch of trouble with wet wood. Between noon and 6pm we just hung out between 800 and 900f, fighting to try and get it to rise. However, we found some dry stuff eventually (under the cords of wet wood we’d stacked infront of it on Saturday) and got the temp up to 1300 in a couple hours.
Since then thing have been going smoothly. They did body reduction during the graveyard shift – putting the kiln into heavy reduction to pull iron oxide (and others) to the surface of the pots. They also started side stoking today, so there’s more to do. Luckly we’re well set for side wood for now!

Firing, day 1

We lit the kiln at about 9pm last night, with the loading wrapping up smoothly. We keep the temp to a rise of 50 degrees an hour for the first 1500 degrees or so, which can be tricky. The kiln will want to take off at first. At this point the fire is outside the front of the kiln, with the flames being pulled up through the kiln. This also useful to keep warm!! It gets cold up here! However tomorrow night will be the cold one – the fire will be inside the kiln, but the kiln won’t be hot enough to give off radient heat yet. The kiln is a giant physical mass of bricks, and it will take a lot of time and a lot of heat to get those suckers warm.
I have a photo of Anthony lighting the fire, and of Rick feeding it, last night at 300f. The next photo is Beverly, this morning at about 800f.

Loading

We’re well into the second day of loading the kiln. Loading is always the slowest part of the firing, getting every piece just right. We also have a number of difficult pieces to load this time. Eric Nelson is leaving some pieces to be fired with us, and they’re so delicate and complex that they’re pretty tough to get into the kiln. I’m guessing we’ll be starting it around midnight.

Off to the woodfiring

Tomorrow morning, I will be heading off to my thrice yearly anagama firing. We’ll spend Saturday and Sunday loading the kiln, and start up the fire Sunday night. When will depend on when we get done loading. In the past we’ve started it at times ranging from 6pm Sunday to 3am Monday. Hopefully, it won’t be anything nearly so late as that.
Right now, it looks like I’ll be working the swing shift, 4pm to 12:30am. The schedules are still a bit amorphous, but I hope it works out like that. There’ll be nine of us, working three different shifts. We’ll fire for about 110 hours, shutting it down some time on Friday.
I’ll try too keep things updated on the blog, and I’ll also keep things going on twitter as well! Off I go!